May 12th, 2006

Fish-Fred

More contractor/remodeling notes

The backerboard for the tile is all done. The sheetrock guy apparently came at some point and sanded a little bit, but didn't deal with most of the issues Tyson had marked, so he'll have to come back. Twice. (Once to patch and mud, once to sand.)

Collapse )

Collapse )

Tyson looked the whole job over, and says there's not much he can do except the door trim until the cabinets get here. So many of the walls have cabinets that it's not worth doing baseboards yet. So, we wait on the tile, and on the cabinets. Maybe some painting will happen in the meantime, after the sheetrock is completed.