I've sent off an email to Betsy, cc:'ed to my architect, of the things I want changed from the plans. These include the necessary structural beam to replace the load-bearing wall, the cabinet changes, removing the (expensive and, I'm now convinced, unneeded) floor drain in the laundry room, and a possible addition of a warming drawer if the cabinet under the wall oven will hold it.
Betsy will start on the contract proper, and we'll meet next week and get that hammered out.