Nancy Barber (nlbarber) wrote,
Nancy Barber
nlbarber

Kitchen contractor chosen

It's done: after talking to both bidding contractors today, I told Betsy (former high bidder, now right in the range of the other two reasonable bids) that she has the job. The contractor I was leaning against called me to see if I'd made a decision before I'd had a chance to talk to the one I was leaning towards, so I had to just say 'no decision yet, but soon'. I'll call him tomorrow to say thanks, but no--and hope that I can just leave a voice mail, as I find it a very awkward call to make in person.

I've sent off an email to Betsy, cc:'ed to my architect, of the things I want changed from the plans. These include the necessary structural beam to replace the load-bearing wall, the cabinet changes, removing the (expensive and, I'm now convinced, unneeded) floor drain in the laundry room, and a possible addition of a warming drawer if the cabinet under the wall oven will hold it.

Betsy will start on the contract proper, and we'll meet next week and get that hammered out.
Tags: remodeling
Subscribe
  • Post a new comment

    Error

    default userpic

    Your reply will be screened

    Your IP address will be recorded 

    When you submit the form an invisible reCAPTCHA check will be performed.
    You must follow the Privacy Policy and Google Terms of use.
  • 0 comments