Nancy Barber (nlbarber) wrote,
Nancy Barber
nlbarber

Today in the remodeling...

The new electrical panel is in and hooked up. The cats were distressed: the backup battery gave out in the carbon monoxide monitor that's in my bedroom (where they are shut up for the day during construction), and it was bleeping shrilly when I got home. They were very ready to get out of that room and away from the noise.

On the framing front, the pocket door to the guest hall is in, mostly. (I pulled it out fully and it got slightly out of its track, so it lacks a guide, or some shims, or both...or something else. And hardware.) The casings for the other 2 new pocket doors (to the Cat Room, and between the kitchen and utility room) are in place but still aren't fully installed.
Tags: remodeling
Subscribe

  • Readerware tech support

    Super tech-support kudos to Readerware, whose book database I've been using for years to maintain a (mostly complete) catalog of my books. (Several…

  • Florence, day 3

    We started the day on the south side of the river at the Pitti Palace, a de Medici palace, though the bought it from Luca Pitti and added on. It's at…

  • Florence, day 2

    Breakfast about the same as yesterday, though we discovered that if you can manage to catch one of the staff, you can ask for espresso, capuccino, or…

  • Post a new comment

    Error

    default userpic

    Your reply will be screened

    Your IP address will be recorded 

    When you submit the form an invisible reCAPTCHA check will be performed.
    You must follow the Privacy Policy and Google Terms of use.
  • 0 comments