?

Log in

No account? Create an account

Previous Entry | Next Entry

Another inspection done

Electrical rough-in inspection is done. The electrician also dealt with the items I'd mentioned to the contractor, and plus some: moved the switch for the outlets in the Weird Room next to the kitchen door, added the rough-in for the outlet where the old garage door was, swapped the switch positions for the carriage light and the Cat Room overhead light. And he pulled wire for what I think will be the under-cabinet lights.

Next up: framing inspection. Maybe tomorrow.

Oh, on the garage door: Tyson the framer was going to re-use the old door frame, even though we are turning the door around to open the other way. But he decided the old frame was in too bad a shape and had to back up and order a pre-hung door. Which will be here sometime. Be great if he got that done while waiting for the framing inspector, but that's probably too much to ask.

Tags:

Profile

Fish-Fred
nlbarber
Nancy Barber

Latest Month

July 2018
S M T W T F S
1234567
891011121314
15161718192021
22232425262728
293031    

Tags

Powered by LiveJournal.com
Designed by Tiffany Chow